News classification

Products

Contact

企业名称:东海县安绘石英制品有限公司

联系人:李经理

电话:0518-87275538 

手机:13775410781

邮箱:1508028999@qq.com

地址:连云港市东海经开区黄河路与245省道交叉口东南侧

How to replace the heater?

Your current location: Home page >> News >> 行业新闻

How to replace the heater?

Date of release:2019-06-29 Author: Click:

As an electric boiler heating body manufacturer, today Xiaobian will come and talk to you about how to replace the electric boiler heating body.

Electric heating boiler is mainly composed of boiler body, electric control box and control system. The boiler body is composed of a drum and a heating tube. The electric heat pipe of the boiler is the heart of the electric boiler, and the electric heating tube is the core component of the electric heating boiler, which directly determines the service life of the boiler, and its performance is directly related to the performance of the electric boiler.

The electric heat pipe is generally selected in the form of a tube, which is composed of a metal stainless steel tube, a nickel-chromium alloy heating wire, a leading rod, a connecting base and a magnesium oxide filler. Under normal circumstances, the service life of the electric heating tube is 10,000-30,000 hours. The service life of the electric heating tube mainly depends on the material of the electric heating tube, the surface heat load and the user's operation management level. The electric heating tube is a nickel-chromium stainless steel pipe with a surface heat load of 6-9W/cm2. In addition, the rated electrical power of the electric heat pipe is also a very important performance indicator. Under rated working conditions, according to the national standard, the electric power deviation should not be greater than 5%.

So what are the steps for the replacement of the electric boiler heater? When replacing the heating tube, there are two parts, the first is to take out: first cut off the power supply cabinet, master which heating tube is the replacement part according to the prompts of the control cabinet in advance, and then open the front cooling window, loosen the screws on the heating tube flange that need to be replaced, separate it from the power cord, and carefully remove the old heating tube. Next is the installation: Take out the prepared power in advance, the heating tube of the same size (in general, the manufacturer is equipped with spare parts) straight into the heating tube warehouse, tighten the screws, connect the power cord, and then carefully check the case of error, close the cooling window, start the general power cabinet, check whether the data displayed on the touch screen of the boiler control cabinet is normal, you can restart the boiler after normal.

If you want to know more about electric boiler heating body, please feel free to contact us.

The address of this article:http://www.lygah.com/en/news/422.html

Key word:

Recently browse:

Products:

News:

code

Scan QR code

分享 一键分享
Please leave a message for us
Please input the message here, and we will contact you as soon as possible.
Full name
Contacts
Telephone
Seat / mobile phone number
mailbox
mailbox
address
address